Elizabeth Nelson's City Council Blog

LocalPoliticsMatter.png

I write a City Council newsletter with my summary of agenda items coming before City Council. Sign up to receive it first via email, or read it here later on this blog.
I post charts of how Council voted after each meeting, and also post my perspectives on how issues were resolved. I post news that affects Ward 4 residents tagged with "Ward 4 News", with construction updates also tagged "Construction 2021". News that affects all city residents is tagged with "City News".

Traffic Control Plan for Ann Arbor-Saline & South Main June 24th - July 12th

Temporary Traffic Control Plan:

Beginning Monday, June 24, 2019, traffic will be reduced to one lane in each direction at separate times on either northbound or southbound Ann Arbor-Saline Road and South Main Street to perform the work, which is expected to be completed by Friday, July 12, 2019, weather permitting.


The contractor will maintain pedestrian traffic during construction.


Location and Limits of Affected Area:

Ann Arbor-Saline Road between West Eisenhower Parkway and South Main Street & South Main Street between Ann Arbor-Saline Road and Scio Church Road


Description of Work:

The contractor, Ajax Paving Industries, and its subcontractors will be rehabilitating the existing asphalt paths along the roadways. Construction activities involve partial and full depth pavement removal and repairs; removing short segments of concrete curb and gutter; concrete sidewalk ramp work; resurfacing of the paths; and restoring areas disturbed by this construction.


More information can be found at www.a2gov.org/roads