Temporary Traffic Control Plan:

Beginning Monday, June 24, 2019, traffic will be reduced to one lane in each direction at separate times on either northbound or southbound Ann Arbor-Saline Road and South Main Street to perform the work, which is expected to be completed by Friday, July 12, 2019, weather permitting.


The contractor will maintain pedestrian traffic during construction.


Location and Limits of Affected Area:

Ann Arbor-Saline Road between West Eisenhower Parkway and South Main Street & South Main Street between Ann Arbor-Saline Road and Scio Church Road


Description of Work:

The contractor, Ajax Paving Industries, and its subcontractors will be rehabilitating the existing asphalt paths along the roadways. Construction activities involve partial and full depth pavement removal and repairs; removing short segments of concrete curb and gutter; concrete sidewalk ramp work; resurfacing of the paths; and restoring areas disturbed by this construction.


More information can be found at www.a2gov.org/roads

Recent Posts

See All

South Maple traffic control plan on Feb 11th

The following was issued by the City on Feb 10, 2020: Notice of Temporary Traffic Control Plan: South Maple Road between Pennsylvania Avenue and Pauline Boulevard ; Tuesday, Feb. 11, 2020 (7:00 AM - 3

South State Street detour Jan 8th

Notice of Temporary Traffic Control Plan South State Street, Between Hill Street and Packard Street Wednesday, Jan. 8, 2020 Location and Limits of Affected Area: South State Street, between Hill Stree

Elizabeth NELSON

DEMOCRAT for Ann Arbor City Council Ward 4

  • Email
  • Twitter
  • Instagram
  • Facebook
  • YouTube

Paid for by the Committee to Elect Elizabeth Nelson 

PO Box 2243. Ann Arbor. MI 48106-2243